Every cost estimate rests on assumptions: the scope it covers, where the quantities came from, how the prices were obtained and when, what's excluded and what allowances have been made. The basis of estimate writes those down.

What It Should Contain

  • The scope the estimate covers, and what it leaves out
  • The source of the quantities and the design maturity behind them
  • How labour, plant and materials were priced, and the date of the pricing
  • Allowances, escalation and contingency, each stated separately
  • Exclusions and assumptions, in plain words

How a Reviewer Uses It

A reviewer works through the basis assumption by assumption, testing each against its source and saying which ones move the answer. The same record lets the team update the estimate as the design changes.

What to Ask

  • Is there a written basis of estimate, and is it current?
  • Which assumptions carry the most money?
  • What design maturity is the estimate built on, and does that match the stage of the project?